Friday, November 21, 2008



Wednesday, November 19, 2008

Shopping?

I'd been out in the morning helping Nick T get my old rowing boat to the sailing club. Za had said he was getting fat so he has decided a spot of rowing would do him the world of good. Well once he'd launched I left him to it and went back home.

Around 1.00pm I suggested to Nicky that we should get some supplies in. Now bearing in mind we had not had much for breakfast we reckoned that we should eat before we shopped, the old adage "Never shop when you're hungrey" came to mind. So we dined at "Beavers cafe" after which Nicky said we'd have to walk to Ocean Bay to burn off the enormous all day breakfast she'd just eaten.

We got to Ocean Bay and being such a nice day we thought we'd carry on and see what the white triangle was at the other end of the beach. As you can see it is a pile of white rocks which someone has painstakingly erected. There are no white rocks for a several hundreds of yards so it must have taken quite a time to build



Looking back we realised that we should get back before the sun left the sky as we had still not been to the shops. By the time we'd shopped and got home it was 5 o clock.


Time for tea already.






Monday, November 17, 2008

Fencing completed

It hasn't been the best weather for it but at least the rain held off for most of the time. We used metposts for ease of replacement but because of the soft nature of the ground we set them in concrete with the sockets just protruding to allow drainage. Time will tell if this is the right choice.
We also changed the security light on the garage and put a new alarm on the house. Mended all Lukes broken guitar leads and made a couple of new ones.
In Granpa's house we fixed his broken shaver light ( down to a bad design )


Wednesday, November 12, 2008

Rendering all done

There are very few manual jobs that I cannot put my hand to, so today was time to have a go at external rendering. I can plaster to a reasonable standard so I thought this would be a very similar. Well I was wrong,

Ok the technique is the same but it's so much heavier. It played havoc on my upper arms and wrist. By the end of the day I couldn't get the pressure on the float to make the muck stick to wall. It is also a lot harder to get flat. Fortunately Luke was not too worried about that as he plans to paint it then maybe grow some vines up to create a mediterranian feel.




Tuesday, November 11, 2008

Scratchcoat goes on

Today we cleared up the area from yesterdays bonfire and got down to removing the old pebble dash. We kept any original scratchcoat if it didn't fall off. No sense in wasting effort is there. Went to buy some materials then got down to work. Bearing in mind I've never done rendering before it came out quite well. By the time all that was done it was nearly dark. aren't the days short this time of year!

A sad end for the summer house

Monday, November 10, 2008

Dad on loan for Jobs at Lukes house.

Improvements to Lukes garden are to include a decking area in front of the garage. First job on the list is to render the end of the garage facing the house to give it a more asthetic look. However this necessitates the removal of the old summerhouse which I loving put together over a period of a few weeks, many moons ago. None of your B&Q stuff here, this was proper tenon joints, screwed and glued all made from scratch.

Well it took about 10 minutes to reduce it to a pile of timber, some rotten, some good. Then about 5 hours to burn it all, which in the pouring rain was quite fun.





Sunday, November 09, 2008

Lacey

This rather glum looking thing is Greg's new puppy that they have named Lacey. Very well behaved and almost house trained. The photo doesn't do it justice as when it's not asleep it bounces around trying to ambush Bailey (Gregs other slightly older pup)


Friday, April 25, 2008

Back in the water

Whoo hoo. At long last she's back in the water. After a week or so of bitterly cold east winds, everything calmed down and as you can see, it was a lovely evening to put the last bits of antifoul on the centreboards. I get the last lift of the day and he guys at the yard lift her to about six feet off the ground. They leave her there overnight which gives me about three hours before dark to get the last bits done. .
You can see the difference in draft quite clearly in this shotNext day we set off with four aboard Robert, Mike Greg and me. Stop off at Dorset lake to drop Mike and Robert on Yeta then travelled back in company. .


After a gentle start we ended up with a reef in and were about to put a second in as the wind rose to 25 knots off Old Harry As we entered Swanage Bay it settled down to an easier 17knots as we moored up.

Tuesday, April 08, 2008

Busy week ... Again



Well, again a week has gone by without a blog entry. The move went well on Friday, a warm and pleasant day. We were on the go from 8.00 in the morning till about 10.00 at night and absolutely knackered by the end of the day. Saturday we woke with stiff muscles and sore body parts where we had injured ourselves lifting and carting. We only had the van for a day, and we should have recruited more muscle as there was still lots to move. Thank goodness for the carrying capacity of our Previa. . We had motored down on Saturday for a surprise 50th birthday meal for Greg, the meal was a surprise, not the birthday. And then came the snow. To be honest there wasn't much of it in Swanage. However there was a 10cm layer back at the house in Heston.

Tuesday, April 01, 2008

Movin' House

Haven't blogged for a week, as we have been so busy. 30 years of accumulated tat to sort out, much of which much is now in the council dump.
It's going to be strange when we come back to visit Luke and Sarah. They will no doubt be decorating in a style that we wouldn't have chosen, but thats a good thing. It was also quite revealing how many little defects in the house you've just put up with over the years. The creaky floorboard, the unpainted pipe on the radiator, that sticking door, the unfilled screw holes from when you took down the shelf three years ago. Now they all stare at you and say "five minutes work/effort would have put me right".

Anyways, three more days and everything has to be packed and ready to go. Must stop writing and start packing.

Friday, March 21, 2008

Rudder noise solution?


The gemini forum is regularly speckled with entries complaining about rudder slap when at anchor. This is a consequence of the raising rudder design
The Bearing Casing (pictured below) is the part that swivels and this sits in a slot. That slot has a fairly generous amount of clearance, about 2 -4 mm. In certain tide / wind conditions or even the wash from passing boats is enough to make the casing "slap" within the slot. Now if you reduce the clearance then you will have the danger of seizing the mechanism. There are various workarounds, the most popular being thin wedges pushed into the slot. Well here's my attempt at a solution. I have attached to the casing some rubber cups which bridge the gap without seizing the casing in the slot and at the swivel point some rubber tube again either side of the casing. These rubber cups are the items you place in the feet of your furniture to protect your polished floors.

Until we get back in the water theres no way of knowing how effective this will be and I'm guessing I might have to employ stronger rubber but then we are back to the problem of siezure


Monday, March 17, 2008

Jobs on the boat

At long last I have been able to get to the boat to some work on it. I resecured the shore power socket. Cleaned the rear port cabin as there was some mould building up in there. Re - installed the water tank and tightened all the water connections. I have long suspected one of the joints has been leaking as I get water in the port bilges. As there are no though hull connections below water line in this side it must be rain water or water from the tank. Investigations continue.


As the weather was dry I decided not to delay and got the antifoul applied. Blakes Tiger plus did a very good job last year with only a small layer of slime evident at haul out at the end of the season. it was a bit of a rush as light was fading towards the end of the job. Not perfect , as the masking tape didn't stick in a couple of places. Ooops! Waves on the waterline.


Sunday, March 16, 2008

It's been a rainy Weekend

It's been a miserable weekend and now it's over I can get down to some work on watanga. Lots to do as launch time is looming. I want to get it back in the water as soon as possible. The wind speed seems to have given up, the rudders are going to get a hush kit. Hopefully I have thought of a modification to silence them. Theres water tanks to refit all the soft furnishings to go back, and I still have to find out where the rain water comes in although I now have a couple of ideas. The stanchion bases are a favourite leak site and also where the shroud plates pass through the cabiin roof. so there a bit of work ahead.

Thursday, March 13, 2008

Diet that infamous word.

I have been at 12-13 stone for some time now and while it's not obese I am aware that I'm still over weight. From age 17 through 35 I weighed exactly 10st 4lb and it didn't seem to matter what I ate or drank, the weight just stayed the same. However I was playing Rugby and squash and training once or twice a week.

Now there's nothing like stating publicly that you are going to diet to doom it to failure but here goes. I weighed in at 12-6 this morning and would like to get to betwen 11 and 11-7 for the summer. I also have read that you should aim to lose weight slowly so at 1-2lbs per week I aim to hit the top target 11-7 around June time .

This article on fat and diet http://members.shaw.ca/bodybuilding/Fat.html seems to make sense and I lke the idea of not stopping eating so lets see what happens.

Monday, March 10, 2008

High Tides and Storms


The sea was as high as I have ever seen it at Swanage today. With very strong winds from the southwest the sea in the bay was relatively flat. However there was still a significant swell coming in despite the offshore wind direction. The studland ferry suspended operations at high tide. The ferry was fine but the road leading to it was awash at times. It's not often you would be able to drive upwards onto the ferry.!


The pier head building was getting an impromtu pebbledashing as the sea surged across the road at pier approach and the Police decided to close this to traffic. The Mowlem too was getting a right pounding.

At Buckshore, the tenders on Slippery ledge were being jostled by the waves. Just as well they were all tied down. The sea was washing under the boats on the beach but local club members were there monitoring the situation, ready to move boats if necessary.

Friday, March 07, 2008

Another rush Weekend

The weekend's here again, Hoorah. It's almost like when I was working, slogging through the week only wishing the weekend was here. Still I keep telling myself it will all be over soon, house sold, other place rented, Sitting on the boat wondering where to sail next.

Still there's a social on this weekend with a meal and music from Jim Etherington to help us through the evening.

Sundays another blur of candidate interviews, the end is getting close only a few more to do. Frankly this is the best part of the membership job as you get to know everyone.

Have spent a lot of time today investigating the web for suppliers of various parts for the boat.

Wednesday, March 05, 2008

Putting up a new fence



It is sad to think that for over 25 years we have got on with our neighbours. For all that time we have had a shared alleyway between the two houses. Now we have decide to erect a high fence to hide the slum that was the house and the jungle that was once a beautiful garden carefully tended by the original owners. The place is now rented accomodation, and while the neighbours are pleasant enough, neither they nor their landlord give a monkeys about the state of the house or garden.

Monday, March 03, 2008

New Members

Dashed back to Swanage on Saturday night as I was interviewing for New Members at the sailing club on Sunday morning. This takes about 30 mins per applicant depending on how chatty thay are or how many questions they have. Everyone seems quite keen to help out this year. It's good to see enthusiasm in an applicant. No bad vibes from anyone yet. Had a sore throat by the end as had so much explaining to do.

Monday Back to London on the coach leaving Swanage at 7:30 am, back to work on the house. I need to start thinking about ordering bits for the boat, and scheduling the work in that needs to be done.

Saturday, March 01, 2008

London Dinghy Show

About 25 members of the sailing club travelled to Alexandra Palace in North London to support the club as we had been shortlisted for thre RYA sailing club of the year award. As well as keeping an eye out for a bargain or two!

It was all very exciting, Swanage Sailing club had made it to the last five in the country to receive the award. We didn't win but it was a great honour to be up there amongst the finalists. Top honours went to Gurnard Sailing Club on the Isle of Wight. We were secretly relieved as once we saw the the size of the trophy we realised we would have to have a new trophy cabinet!!!

Thursday, February 28, 2008

The floor finished


Well thats it done but in hindsight maybe we should have hired a cement mixer. Luke and I both have backache now.
Next onto fitting the doors, door furniture and refitting the alarm.
We are off to the dinghy show tomorrow, Swanage Sailing Club are in the top five shortlist for club of the year. There's a good contingent of us going so should be a good day out.

Wednesday, February 27, 2008

Luke hard at work, leveling the floor


30 years of not throwing stuff away!

All the bits and bobs that were banished to the garage are now piled up in half a garage. Theres no room to move. I will miss having the space to do stuff here. It's been a garage, a car repair shop, I've built a rowing boat in here, built furniture, mended bikes. Why am I selling it again?


Tuesday, February 26, 2008

The floor




Project Studio

With Luke now wanting to extend his music publishing capabilities further, we have gone into project mode and are extending his studio. This involves refurbishing the garage which has been in a state of disrepair for some years. The end and side walls of this end of the garage were cracked and ready to fall down. So after propping the roof up, I helped it on it's way. You can just see the bow in the side wall thats being held in place by bracing.






Then you rebuild it, adding a brand new door.


Yes I know the courses are not level but I felt more important to be able to "stitch" the bond into the side wall when the time came.







Once the walls had been built and the room was all cosy we put up 4" of acoustic lagging followed by two layers of 12mm plasterboard. The room became a lot quieter almost as soon as the last piece was up.



A hole was sawn through into the mixing room and a frame put in and sealed with caulking. This frame was later triple glazed.







Then the whole room was dry walled using the direct bonding method




Then we added the electrics all surface mounted

Next the floor!!!